FSCAutomatic Fire Damper

Fire & Smoke Control

Motorised or combined manual-electric dampers intended to control fire/smoke spread through ventilation ductwork. Suitability depends on tested classification and approved installation details.

Send a Specification
Fire & Smoke Control representative HVAC equipment

FITAPPLICATION AREAS

Best fit

  • Commercial ventilation systems
  • Plantrooms/duct risers
  • Public/residential buildings
  • Fire/smoke compartment interfaces

POSITIONPRODUCT BASIS

Product position

  • Galvanised steel construction
  • Trigger/actuation options subject to model
  • Custom dimensions may be possible
  • Actuator/fail-safe details must be confirmed

FAQBUYER QUESTIONS

Buyer questions on Fire & Smoke Control

What evidence is needed before a fire damper can be offered for a UK application?

Life-safety product: the exact tested model, classification, declaration and destination-market evidence must be verified before this product is offered for a UK application. The manufacturer must provide the relevant evidence; OLIVE LION coordinates the enquiry but does not certify, approve or verify compliance or suitability.

What information is needed before requesting a quotation?

As a minimum: the product type, quantity, application, required duty or performance, destination country and target delivery. Drawings, schedules or existing specifications help suppliers respond accurately and reduce clarification rounds.

Who is responsible for confirming fire and smoke damper suitability?

Suitability depends on the exact tested classification and approved installation details. Assessment and approval rest with the relevant fire engineer, designer or approving body; OLIVE LION does not confirm suitability.

How should UK electrical, controls and documentation requirements be communicated?

State the supply voltage and phase, control or BMS interface, installation constraints and the documents your project needs in the enquiry. Documentation requirements can be reviewed as part of the sourcing process, but design responsibility and approval remain with the project engineer or consultant.

Send a fire & smoke control specification

Start an HVAC Sourcing Enquiry